pattern glass rolling machine by Qingdao Hexin Machinery Co.,Ltd.
Qingdao HEXIN , possesses a high-quality team in professional research, product manufacture and marketing. Since the foundation of our company, we have researched and produced a series of glass equipment.
We successfully promote products to glass industry, relying on good reputation, top-ranking services, senior industrial experience and abundant technical strength. The general professional knowledge of glass equipment makes a solid foundation for future challenge.
Qingdao HEXIN , insists on the philosophy of "Integrity is Gold, the Way of Operation" and insists on the direction of "creative development and hard work" for the simultaneous realization of both economic and social benefits.
HXY-1400 Calender Machinery
I .Use
HXY-1400 calender unit is to be improved on the basis of domestic and foreign similar calender, having a more rational structure, high degree of automation.
HXY-1400 calender unit is suitable for ultra-white embossed glass and ordinary embossed glass production and processing.
II. Performance and parameter
1、Application of plate width
For rolled plate glass 1400mm in width;
The fuselage shape size(mm): 2800*1800*2300
Weight:6500kg
2、Power device
Calendering machine main motor model R107DV132S4/VS/TF
Motor Power 5.5KW
Motor reduction ratio 141.28
Motor output speed 9.9r/min
Motor operating voltage 380V/660V/50HZ
Walking calender motor model Y90L-4
Motor Power 1.5KW
Motor speed 1400r/min
Motor voltage 380V
Reducer Model WPDA Specifications 100
Gear ratio 1:40
Walking speed 9M/min
Calender lateral movement motor model Y90S-4
Motor Power 1.1KW
Motor speed 1400r/ min
Motor voltage 50Hz Reducer Model NMRV Specifications 063
Gear ratio 1:20
Translational velocity 30mm/min
3、Various body dimensions, motor selection, the upper and lower rollers specifications designed according to user requirements.
HXY-2400 Calender Machinery
I. Use
HXY-2400 calender unit is to be improved on the basis of domestic and foreign similar calender, having a more rational structure, high degree of automation.
HXY-2400 calender unit is suitable for ultra-white embossed glass and ordinary embossed glass production and processing.
II. Performance and parameter
1、Application of plate width
For rolled plate glass 2400mm in width;
The fuselage shape size(mm): 3820*1820*2200
Weight: 8500kg
2、Power device
Calendering machine main motor model R107DV132S4/VS/TF
Motor Power 5.5KW
Motor reduction ratio 141.28
Motor output speed 9.9r/min
Motor operating voltage 380V/660V/50HZ
Walking calender motor model Y90L-4
Motor Power 1.5KW
Motor speed 1400r/min
Motor voltage 380V
Reducer Model WPDA Specifications 100
Gear ratio 1:40
Walking speed 19m/min
Calender lateral movement motor model Y90S-4
Motor Power 1.1KW
Motor speed 1400r/ min
Motor voltage 50Hz Reducer Model NMRV Specifications 063
Gear ratio 1:20
Translational velocity 30mm/min
III. Various body dimensions, motor selection, the upper and lower rollers specifications designed according to user requirements.
Calender machine for flat glass
Our glass rolling machines are of the modern generation for solar, wired, and patterned glass. We can customize the dimension according to customers requirements,
width from 1600mm to approx.3000mm, melting capacity to approx.150ton per day. Our rolling machines are built with solid and long lasting construction,
aiming to short and save the maintenance and repair times; all drives are electronic controlled separately.
Notice for use
1、Operate manual strictly in accordance with requirements before using the rolling machinery.
2、Before rolling machine operator must strictly check whether the motor is tightened, the upper and lower rollers are tightened in place, the screws are tightened each sprocket, the chain tension is appropriate.
3、Before calender walking, rail must be clean, without debris, in order to avoid accidents.
4、Panning left and right sidewalls calender, the available motor drive or from the link manually fine-tuning, moving up and down using the hand wheel from the linkage rod linkage or fine-tuning screw should be kept clean and lubricated.
5、Calender place to kiln after positioning device should be installed according to the site location to prevent displacement during normal operation calender.
6、Regular inspection, cleaning gear chassis, regular oil changes, to ensure good working order.
7、Before each shift on the sprocket on the main transmission system, when the chain filling oil, keep a safe distance.
8、 Calender during normal operation, do not touch or objects touch operation sprocket and chain, not frolicking beside the machine, equipment and avoid accidents.
Comments
Post a Comment